|

Interior
glazing installation, Wally Telep contractor & Tilo standing.
9/14/1997
|

Front
View from north looking s/e.
9/14/1997
|

Side
view same view as above (#232) but closer.
9/14/1997
|
|

Steel
frame erection west side, looking north west. 4/11/1997
|

Steel
worker 30 ft in the air making connection. 4/11/1997
|

Left
to Right: Frank Bole Structural Engineer, Wally Telep General
Contractor, Bill DuBourdieu Architect, with steel frame in background
looking n/w.
4/11/1997
|